Gantt ​

The Gantt widget shows the items of a data source as tasks across time: a task list on the left and a bar for each task on a timeline on the right. Use it to plan projects, follow progress and see which tasks are late.

Dashboard viewer: a Gantt of project tasks

Add a Gantt ​

  1. Create a data source on your tasks list. It needs a start date and an end date for each task.
  2. Open the dashboard in edit mode.
  3. In the Widgets pane, open the General tab and drag Gantt onto the dashboard. Resize it.
  4. Select the widget. On the Properties tab, give it a Title and, if you like, a Subtitle, Description and Icon (see the Common settings).
  5. Open the Assign Data tab, click Choose data source and pick the data source.
  6. Assign the fields, see below.
  7. Click Save & Exit.

Assign the fields ​

FieldWhat it does
Task name (required)The name shown in the task list and on the bar.
Start date (required)When the task starts. Date fields only.
End date (required)When the task ends. Date fields only.
ProgressHow far the task is, from 0 to 100. Fills the bar. Number fields only.
DurationThe length of the task. Number fields only.
PredecessorThe task this one depends on. Draws an arrow between the two bars.
ParentThe parent task. Child tasks are shown under their parent, which can be expanded and collapsed. A lookup to the same list works.

Under Columns, add the fields you want in the task list next to the timeline. Each column has its own Column settings.

Designer, Assign Data tab of a Gantt

Today line ​

A dashed Today line marks today's date on the timeline, so you can see at a glance which tasks should be finished or under way. Today is the site's today, in the site's time zone, and the line moves on by itself while the dashboard stays open.

The line shows only when today falls inside the timeline the Gantt shows, which runs from a little before the first task to a little after the last one. The timeline isn't widened to reach today, so a plan that is over or hasn't started yet looks the same as before.

To hide it, switch off Show Today Line under Layout & Appearance. It's on by default.

Settings ​

Basic Settings ​

SettingWhat it does
Allow SortingLets viewers sort the task list by a column.
Allow FilteringShows a filter on each column of the task list.
Allow Column ResizingLets viewers drag column edges to resize them.
Allow SearchingShows a search box above the Gantt.
Search Hidden ColumnsAlso searches fields that aren't shown as columns.
Search on Key StrokeSearches as you type, instead of after pressing Enter.

Layout & Appearance ​

SettingWhat it does
Wrap Text in CellsWraps long values in the task list onto more lines.
Wrap Text in HeadersWraps long column headers onto more lines.
TimelineThe scale of the timeline: Days (the default), Weeks or Months, or Fit to plan, which fits the whole plan into the width of the widget.
Show Today LineShows the today line. On by default.

Item Actions ​

SettingWhat it does
Allow AddingShows a button to add a new item through the list's form.
Allow ViewingLets viewers open an item's form.
Allow EditingLets viewers edit an item. When editing is on, the form always opens in edit mode.
Allow DeletingLets viewers delete an item.
New Form Query ParamsExtra values passed to the new item form, for example to fill in the project.